Show details
One-man operation

One-man operation

SKU: 335-CP
One-man operation EKW The operator stands at the exit side of the system and places the boxes on the slide that is integrated on the top of the system. With the next box, the boxes are pushed to the tipping arch. Here the boxes tip in a controlled manner and are guided into the washing tunnel on the entrance side. The cleaned boxes are removed by the operator again at the exit side. Max. box length: 800 mm
Price on request
One-man operation EKW The operator stands at the exit side of the system and places the boxes on the slide that is integrated on the top of the system. With the next box, the boxes are pushed to the tipping arch. Here the boxes tip in a controlled manner and are guided into the washing tunnel on the entrance side. The cleaned boxes are removed by the operator again at the exit side. Max. box length: 800 mm
For model